Mobile Metal Services LLC · DBA Custom Storm Shutters
Monumental Railings — Terms
Version 2026-10-06 · Effective October 6, 2026
Drawings, measurements and scope
Quoted fabrication and field installation depend on accepted drawings, verified field dimensions, substrates and site access. Engineering, approval and permit responsibilities must be expressly assigned in the project agreement. An unstamped drawing is not an engineering approval.
Changes and acceptance
Changed drawings, dimensions, substrate conditions or installation sequence require a written scope review. Project-specific acceptance and any installation or manufacturer warranty must be stated in the signed agreement.
Contact: info@mobilemetalservices.com
